KiloAtlas
EN
EnglishBahasa IndonesiaTiếng Việt

Process Capability Index Calculator

Calculate Cp, Cpu, Cpl and Cpk from specification limits, the process mean and a positive standard deviation.

Cp

11
Cpu
1 1
Cpl
1 1
Cpk
1 1

Formula

Cp=(USL−LSL)/(6σ); Cpu=(USL−μ)/(3σ); Cpl=(μ−LSL)/(3σ); Cpk=min(Cpu,Cpl).

Cp ≈ sqrt((12)-(0))^2÷(6×(2)) · Cpu ≈ ((12)-(6))÷(3×(2)) · Cpl ≈ ((6)-(0))÷(3×(2)) · Cpk ≈ min((1),(1))

How to use

  1. Enter LSL and USL with USL greater than LSL.
  2. Enter the mean and positive within-process standard deviation.
  3. Read the capability indices for a stable process.

Examples

  • LSL=0, USL=12, μ=6 and σ=2 give Cp=Cpk=1.

Frequently asked questions

Are control limits the same?

No; enter specification limits set for the product or process.

Can Cpk be negative?

Yes, if the mean lies outside a specification limit.

What assumptions apply?

Capability interpretation assumes a stable process and approximately normal measurements; thresholds depend on requirements.

Sources

Updated:

Related tools

Search conversion tools