SWP Calculator – Systematic Withdrawal Plan
Project a balance with fixed monthly withdrawals at month end and an assumed constant return.
Formula
r = annual rate/1200; B = P(1+r)^n − W((1+r)^n−1)/r; if r=0: B=P−Wn.
Projected balance / funding gap ≈ (10,000)×(1.005)^(24)-(100)×(25.43195524) · Planned total withdrawals ≈ (100)×(24)
How to use
- Enter initial capital and the monthly withdrawal.
- Set a nominal annual return and number of months.
- Read the projected balance and planned withdrawals.
Examples
- Capital 1,000, withdrawal 100, annual rate 12%, and 2 months leave 819.10.
Frequently asked questions
When is money withdrawn?
At each month end, after that month's return; the monthly rate is annual rate divided by 12.
What if the balance is negative?
The plan runs out of funds before its end. A negative projection is a funding gap, not an investment balance.
What is excluded?
Taxes, fees, inflation and variable returns; planned withdrawals are not guaranteed.
Sources
Updated: